- Home
- Hajj
- Umrah
- Ministry of Hajj
- Other Ministries
- Audio & Visual
- Help & Advice
- Library
- Français
Rock Cutting
Mountainsides have been stabilized in the boundaries of the Mina area with loose rocks removed and cracks grouted. The level area has been increased up to 700,000 square meters.
Source: Ministry of Public Works and Housing website
Main reference point:
Ministry of Hajj © 2016-2017